S4:Smooth the concrete according to the contour of the mold and wipe off the excess.
S2:Fill the paver mold, plow the concrete with a shovel and make sure to fill each area.
S5:Allow the concrete to set up to five minutes and carefully remove the mold. For the next stretch, rotate the mold a quarter turn and place it next to the paver you just finished. If you are creating a curved path, tilt it slightly.
S3:Use rubber gloves to spread the concrete around the mold and fill any gaps or low points. Tap the mold by hand to remove any air bubbles.
S1:Mix the cement with water according to the packing instructions. When ready for use, the concrete will be the consistency of the oatmeal and thick enough to hold the edges when cut with a shovel.